Verdict — Needs rework
11 checks fail. Spans are likely too long — add a bay or deepen the beams.
Checks passing
46 / 57
Plan efficiency
91.40%
Built-up area
1130.21sq ft
Estimated cost
₹ 11,62,947
Member schedule
| Slab | 125 mm, 8φ @ 300 c/c both ways |
| Beams (all) | 230 × 450 mm |
| Governing beam steel | 2-12φ bottom, 4-12φ top, 8φ @ 300 c/c |
| Corner columns | 230 × 300 mm |
| Edge columns | 230 × 375 mm |
| Interior columns | 230 × 450 mm |
| Governing column steel | 6-16φ, ties 6φ @ 230 c/c |
| Footings | 1.00 × 1.00 m to 1.00 × 1.00 m, 400 mm thick |
| Concrete / steel | M25 / Fe500 |
| Founding depth | 1.5 m below ground, SBC 150 kN/m² |
Governing checks
- Slab span/d — 29.7 vs 35.8OK
- Beam flexure — Mu 24.1 vs Mu,lim 125.4 kNmOK
- Beam shear — τv 0.72 vs τc,max 3.10OK
- Column utilisation — 0.90 ≤ 1.0OK
- Footing bearing — pmax 182 vs 120 kN/m²REVISE
- Lateral case — Seismic governsOK
metres · 0.014 m/px
— — orange dashed = buildable footprint after setbacks■ solid = column at a grid intersection, sized as designedhatched = bay not built on this storey — no slab, beam, column or loadX grid 1,2,3… · Y grid A,B,C…
Planning advice
- Walls and circulation eat 12–25% of the footprint — allow for them before you fill the plan with rooms.
- NBC wants openable window area of at least one tenth of the floor area in a habitable room, one twentieth in a kitchen or toilet.
- NBC minimums: habitable room 9.5 m² with no side under 2.4 m; kitchen 5.0 m² with no side under 1.8 m; bath plus WC together 2.8 m².
- Stack first-floor toilets directly over ground-floor ones — it keeps the plumbing sane.
- Set the grid FIRST and fit rooms into the bays. A column landing in the middle of a bedroom is the classic mistake.
- Put bedrooms north and east; kitchen, stores, toilets and stair south and west.
GrihaKalp gives a first-pass, code-referenced check so you can judge a plan quickly. It is not a substitute for a licensed structural engineer, a soil investigation or municipal approval.