1 · Project & Plot

Start with the plot, the setbacks, how many storeys and what the ground can carry. Everything downstream is derived from these numbers.

Project

Plot and setbacks

Local development control rules govern the setbacks

Storeys and heights

Materials and soil

IS 456 Cl. 6, Table 5 & Table 16

Derived footprint

Buildable length
10.50m
Buildable width
6.00m
Footprint area
63.00
Built-up area
126.00
Ground coverage
46.67%
FAR achieved
0.93
metres · 0.014 m/px
Plot 15 × 9 m1234ABC
— — orange dashed = buildable footprint after setbacks■ solid = column at a grid intersection, sized as designedhatched = bay not built on this storey — no slab, beam, column or load
Built-up105.0 m²Columns11Governing column264 kNConcrete38.2 m³Steel2.30 t11 checks need attention

Preliminary design aid. Not a substitute for analysis and detailed design by a licensed structural engineer. Does not include detailed seismic design to IS 13920, soil investigation, or statutory compliance.